On site Powder Coating facility with Iron Phosphate pre-treatment.
The powder coating plant operates within a 30x10 meter space.
The metal coating facility allows us to produce parts more efficiently.
It has a parts on to parts off time of less than 1 hour 30 minutes.
This allows both lead time and transport costs to be reduced for coating.
The coating plant is large enough to enable the company to deal with both small and large orders and sizes range from small fasteners to chair frames for your powder coated metal requirements.
The automatic powder spraying guns ensure consistent levels of powder coating to be applied evenly on the metal.
Fabricated products can be manufactured in small batches to customer requirements, whitout the added cost of external minimum order quantities for coating.